Bridge to be renewed - A7 in Lower Franconia closed for an hour due to construction work
In the course of construction work on the Talbridge Thulba on Autobahn 7 in Unterfranken, a single track closure will take place on Thursday (11. July). From 18.30 hrs to 19.30 hrs, the autobahn will be closed in both directions between the interchanges Bad Kissingen and Hammelburg, as announced by Autobahn GmbH Nordbayern. The Talbridge Thulba is being renewed. The work has been ongoing since 2020 and is expected to end around 2027.
Info on bridge renewal
The construction of the Talbridge Thulba is taking place in Lower Franconia, specifically in Unterfranken. The viaduct is located between the interchanges Bad Kissingen and Hammelburg on Autobahn 7. Due to the construction, there will be significant traffic disruptions, with a single track closure scheduled in Bavaria on July 11.